Can I send a rough requirement before final drawings are ready?
Yes. Send your current assumptions first, then mark pending items clearly so we can return a provisional quote scope.
Share your application, target specs, and quantity plan. We will respond with practical engineering and sourcing support.
Inquiry Email
Include motor type, OD, voltage, speed, load, quantity, and destination.
RFQ Form
Use the form for quick routing, or email directly when drawings, attachments, or CC recipients are required.
| Required Item | Example | Why It Helps |
|---|---|---|
| Target motor family | Micro BLDC / coreless / Hall / encoder / gear motor | Quickly narrows viable models and quote range. |
| Package and performance | OD 16 mm x 25 mm, 12 V, 18,000 RPM, 2 mNm | Connects the mechanical envelope with real load and speed. |
| Noise and lifetime target | <35 dBA at 10 cm, 5,000 h, 30% duty cycle | Keeps validation methods tied to measurable conditions. |
| Mechanical interface | Shaft, flange, connector drawing revision | Avoids sample mismatch and assembly rework. |
| Quantity plan | Prototype qty, annual forecast, and target FOB range | Improves lead-time and pricing accuracy. |
| Destination and terms | Country, Incoterm, requested ship date | Aligns packaging, documents, and shipping plan early. |
Yes. Send your current assumptions first, then mark pending items clearly so we can return a provisional quote scope.
Use a revision-controlled change request with effective lot and impact scope agreed by both teams.
Yes. Please list required document types in the RFQ stage so they are included in validation and delivery planning.
If your team needs a fast start, use this structure in the first email. It improves quote precision and reduces clarification cycles.
| Output | Purpose | Buyer Action |
|---|---|---|
| Model and architecture direction | Narrow viable options against torque-speed and interface assumptions. | Confirm baseline model path before cost-detail discussion. |
| RFQ clarification list | Close data gaps that affect pricing and lead-time accuracy. | Return missing values and drawing references in one reply. |
| Validation recommendation | Define sample test scope and acceptance evidence for technical sign-off. | Align internal engineering and procurement gates before PO. |